[. . . ] The surface to which this unit is mounted must be capable of supporting a static load of four times the combined weight of the projector and mount. Required Tools: 1/2" socket 5/16" wrench Claw hammer 5/16" hex driver Drill motor - Procedure 1. [. . . ] Remove contents from carton and examine for damaged or missing parts. Preparing Ceiling for CPM-SC16 2. If needed, secure any electrical boxes to the CPMACP by inserting screws from the bottom of the Plate into the boxes. Cut a 2" diameter hole in the ceiling tile at the intended pipe location. Place the CPM-SC16 on top of the ceiling tile and align the coupling with the hole in the tile by moving the channel as needed. Determine where the anchors will be placed to suspend the CPM-SC16 from the structural ceiling. Pass the Cable through a 7/16" diameter hole of the CPM-SC16 then up through the bottom rectangular hole in the Cable Lock leaving at least 3" of the Cable protruding through. Cable can be removed from the Cable Lock by sliding the pin. Figure 7 9. Adjust the location of the CPM-SC16 by pulling on the tag end of the Cable passing through the Cable Lock to put a small gap between the CPM-SC16 and the ceiling tile. NOTE: The load of the CPM-SC16 and projector must be carried by the Cables and NEVER carried by the suspended ceiling grid. Install the pipe and projector mount according to the mount manufacturer's instructions. [. . . ] NOTE: The load of the CPM-SC16 and projector must be carried by the Cables and NEVER carried by the suspended ceiling grid. Install the pipe and projector mount according to the mount manufacturer's instructions. [. . . ]