[. . . ] Quantum|ATL 7100 Series Facilities Planning and Installation Guide 6241101-02 Ver. 2 Quantum|ATL 7100 Series Facilities Planning and Installation Guide, 6241101-02, Ver. provides this publication "as is" without warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability or fitness for a particular purpose. Making copies or adaptations without prior written authorization of ATL Products, Inc. [. . . ] Do not push the library up or down a ramp with an incline greater than 10°. Place stiff plastic or rubber mats on top of carpeting that depresses more than the nominal clearance and over floor cracks and door jambs prior to rolling the library over them. Any side of the library can be used to push the library to the final installation area. When pushing from the front, DO NOT push on the following nonstructural portions: · · · · Load port door Control panel Front door Front door handle Caution: Caution: To move the library to the final installation area: 1 Based on the information above, prepare the path to the final installation area. 2 Verify that all leveling feet are fully retracted. If the feet are not fully retracted, rotate each of the four feet counterclockwise until they are fully retracted. 3 Roll the library to the final installation area. Quantum|ATL 7100 Series Facilities Planning and Installation Guide 17 Chapter 2 Unpacking and Moving the Library Removing the Protective Packaging Material Removing the Protective Packaging Material Refer to the figure 9 throughout this procedure. 1 Locate the library door keys in the accessory kit and open the 2 storage array door. 2 Remove the block securing the gripper. 3 Without cutting it, remove the tie-wrap securing the extension axis platform to the horizontal axis carriage (see figure 8). The tie-wrap is reusable. 4 Gently lift the extension axis up and pull the vertical axis block out and away from the library. 5 Without cutting, remove the tie-wraps securing the horizontal carriage assembly to the frame. The tie-wraps are reusable. 6 Gently push the carriage assembly forward. 8 Slowly lower the extension axis to the bottom (resting) position. 9 Close the storage array door. 18 Quantum|ATL 7100 Series Facilities Planning and Installation Guide Chapter 2 Unpacking and Moving the Library Removing the Protective Packaging Material Figure 8 Extension Axis Tie-Wraps Tie-wrap securing extension axis Quantum|ATL 7100 Series Facilities Planning and Installation Guide 19 Chapter 2 Unpacking and Moving the Library Removing the Protective Packaging Material Figure 9 Packing Block Locations Top horizontal block Gripper block Bottom horizontal block Vertical axis block Storing the Packaging Material To store packaging material: 2 1 Slide the two pallet ramp sections into their shipping position in the pallet. 2 Collapse the cardboard box. 3 Store the box, molded top, pallet and all other packing material for possible later use. 20 Quantum|ATL 7100 Series Facilities Planning and Installation Guide Chapter 2 Unpacking and Moving the Library Packaging the Library for Reshipment Packaging the Library for Reshipment If it becomes necessary to crate the library for shipment, use the procedure below and refer to the figures in this chapter. Note: 2 This procedure assumes that all cartridges have been removed, power is off and cables are disconnected. Observe proper ESD protective measures to prevent damage to the library. Caution: 1 Open the storage array door. 2 Gently lift the extension axis up and place the vertical axis block in position (see figure 9), then lower the extension axis to the bottom position. 3 Install both the top and bottom horizontal axis blocks. 4 Gently slide the robotic mechanism towards the rear of the library so that is up against the horizontal axis packing blocks. 5 Install the tie-wraps securing the extension axis for shipment (see figure 8). 6 Close the storage array door. 7 Raise the leveling feet by rotating each foot counterclockwise (as viewed from above) until they are fully retracted. 8 Move the library to the crating area observing all guidelines described in Moving the Library to the Final Installation Area on page 17. 9 Slide out the two pallet ramp sections (located underneath the library) and secure them to the pallet using the Velcro straps (see figure 7 on page 15). 10 Unfold the shipping bag and align the white tape to the pallet bottom with respect to where the library casters will roll onto the pallet. Quantum|ATL 7100 Series Facilities Planning and Installation Guide 21 Chapter 2 Unpacking and Moving the Library Packaging the Library for Reshipment 11 Roll the library onto the pallet and into the shipping bag. 12 Seal the shipping bag by folding the seam over and taping the edge. 13 Install the stop block in front of library front casters (see figure 7 on page 15). 14 Install the foam cap on the library and install accessory tray. 15 Wrap the box around the library and pallet and install the four plastic retaining clips (refer to figure 6 on page 14). Caution: It is recommended that the steel bands be tightened to approximately 200 lb. of tension prior to shipment. 16 Install steel banding to secure the library and packing material to the pallet. 22 Quantum|ATL 7100 Series Facilities Planning and Installation Guide Chapter 3 3Installing the Library This chapter describes the procedures necessary to install the library. Note: The customer's System Administrator should be present during these procedures. The procedures in this chapter must be performed in the order in which they appear in this chapter. Caution: Required Tools Use the following tools to install the library: · · · · # 2 Phillips screwdriver Wire cutters Carpenter's level 3 3 /4 inch open-ended wrench Quantum|ATL 7100 Series Facilities Planning and Installation Guide 23 Chapter 3 Installing the Library Leveling the Library · · Digital voltmeter (DVM) ESD protection kit Leveling the Library To level the library: Note: 3 Completing this task involves leveling one side of the library at a time, moving in a clockwise direction starting at the front and ending with the right-side of the library. 1 Move the library onto its designated footprint in the final installation area. 2 Lower each foot of the library until it makes contact with the floor. Caution: When adjusting the feet for leveling purposes, DO NOT raise any foot so high that excess weight is transferred to any single caster. 3 Moving in a clockwise direction from the library front, rotate each foot clockwise so that each caster is raised approximately 1/4" off of the floor. 4 Center a carpenter's level on the top front edge of the library. If it is not level: a Determine the tilt of the library and adjust the appropriate front foot with the wrench, checking the gauge each time that a foot is rotated ¼ turn. Repeat step 5 until the front is level, then continue to the next step. b 6 Center the carpenter's level on the top left edge of the library. 24 Quantum|ATL 7100 Series Facilities Planning and Installation Guide Chapter 3 Installing the Library Leveling the Library 7 Check the gauge on the level. If it is not level: a Determine the tilt of the library and adjust the appropriate left side foot with the wrench, checking the gauge each time that a foot is rotated ¼ turn. Repeat step 7 until the left side is level, then continue to the next step. b 8 Center the carpenter's level on the top-rear edge of the library. [. . . ] Il modulo Dallas Semiconductor DS12B887 contiene una batteria al litio sulla scheda madre. Utilizzare questo tipo di batterie in accordo con le normative vigenti. PRECAUCIÓN 2 Este producto contiene una batería de litio. El modelo Dallas Semiconductor DS12B887 de la placa base contiene una batería de litio. Deseche la batería conforme a la normativa vigente de aplicación. VARNING! 2 Denna produkt innehåller ett litiumbatteri. [. . . ]