User manual FLUKE GPC1-16000

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual FLUKE GPC1-16000. We hope that this FLUKE GPC1-16000 user guide will be useful to you.


FLUKE GPC1-16000 : Download the complete user guide (688 Ko)

Manual abstract: user guide FLUKE GPC1-16000

Detailed instructions for use are in the User's Guide.

[. . . ] Operation and Maintenance Manual GPC1-10000/GPC1-16000TM Gas Pressure Controller © 2007 DH Instruments, a Fluke Company GPC1-10000 / GPC1-16000TM OPERATION AND MAINTENANCE MANUAL High pressure liquids and gases are potentially hazardous. Energy stored in these liquids and gases can be released unexpectedly and with extreme force. High pressure systems should be assembled and operated only by personnel who have been instructed in proper safety practices. © 2007 DH Instruments, a Fluke Company All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, for any purpose, without the express written permission of DH Instruments, a Fluke Company 4765 East Beautiful Lane Phoenix AZ 85044-5318 USA. [. . . ] At high pressure, the and push button valves increase pressure much more quickly than at low pressure. Observe pressure evolution carefully when operating these valves (see Section 3. 2. 3). Drain/purge the GPC1 sump regularly to remove any contaminants that may have entered the system from the supply gas or devices connected to GPC1 (see Section 3. 2. 5). Put the PDVV plunger in the START position when starting a calibration or test sequence (see Section 3. 2. 3). Systems and DUTs connected to GPC1 should be emptied of liquids before they are pressurized (see Section 3. 2. 5, 4. 2). · · · · 2. 5 STORAGE AND SHIPPING When leaving GPC1 at rest but still setup for operation: Fully close the INLET valve. Release pneumatic supply pressure by fully backing off the TEST INLET SET regulator. To prepare GPC1 for long term storage or shipping: Disconnect all pneumatic pressure connections and plug the DH500 connections using DH500 plugs or dummy plugs held by gland nuts. If it is necessary to use alternate materials, use caution and ensure that: a) the front panel controls and indicators are protected; and, b) the tubing and components exposed through GPC1's open bottom are protected. GPC1 must ride on its four (4) feet - NOT on its internal components. © 2007 DH Instruments, a Fluke Company Page 14 2. 5BINSTALLATION 2. 6 SPECIAL CONSIDERATIONS FOR HYDROCARBON FREE OPERATION A special "hydrocarbon free" version of GPC1 (P/N 401801 or P/N 402201) is available. This part number is delivered free of known sources of hydrocarbon in the GPC1 high pressure gas circuit. Of course, GPC1 will remain hydrocarbon free only so long as hydrocarbons are not introduced from an external source. To maintain a hydrocarbon free GPC1, only connect devices to it that are known to be hydrocarbon free. If using a gas booster to supply the high pressure, the gas booster must be a hydrocarbon free version. If using a PG7202 piston gauge, the PG7202 must be a hydrocarbon free version and used with Krytox® lubricated piston-cylinder modules. Page 15 © 2007 DH Instruments, a Fluke Company GPC1-10000 / GPC1-16000TM OPERATION AND MAINTENANCE MANUAL NO T E S © 2007 DH Instruments, a Fluke Company Page 16 3. OPERATION 3. 3. 1 OPERATION OPERATING PRINCIPLE Numerical references in this section refer to Section 3. 1, Figure 6. GPC1 is a self-contained system designed to set and adjust gas pressure into static pressure test and calibration systems. GPC1-16000 operates from atmosphere (zero gauge) to 110 MPa (16 000 psi). GPC1 combines the capability to execute large pressure changes very quickly with very fine pressure adjustment. These are rough pressure control using the TEST INLET valve (12) and TEST OUTLET valve (15) and fine pressure control using the PDVV (+) (13) and (-) valves (14). The first means of generating and adjusting pressure uses the external gas pressure supply (1) with the TEST INLET SET regulator (5), TEST INLET valve (12) and TEST OUTLET valve (15). This combination is used for filling the system under test, making large pressure changes and for rough pressure control. [. . . ] PDVV is at minimum end of stroke position. PDVV will not increase pressure. PDVV will not decrease pressure. Opening INLET valve increase pressure. does not TEST INLET SET regulator is set too low and/or external pressure supply to low. Page 27 © 2007 DH Instruments, a Fluke Company GPC1-10000 / GPC1-16000TM OPERATION AND MAINTENANCE MANUAL NO T E S © 2007 DH Instruments, a Fluke Company Page 28 6. APPENDICES 6. 6. 1 APPENDICES GPC1 TERMS, LABELS, AND SYMBOLS (GLOSSARY) , Fast ( ) and slow ( pressure adjustment. Used to increase pressure and for fine Collar The DH500 fitting element that is threaded onto the tube and provides a surface for the gland to push against. Counter-clockwise Clockwise High pressure, gland and collar type fitting for 1/4 in. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE FLUKE GPC1-16000




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual FLUKE GPC1-16000 will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.