User manual GENERAL ELECTRIC AGQ05

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual GENERAL ELECTRIC AGQ05. We hope that this GENERAL ELECTRIC AGQ05 user guide will be useful to you.


GENERAL ELECTRIC AGQ05 : Download the complete user guide (3288 Ko)

Manual abstract: user guide GENERAL ELECTRIC AGQ05

Detailed instructions for use are in the User's Guide.

[. . . ] You never have to look far to find support and service for your generator. For quick service when you need it most fill out the information below and keep your original receipt with this manual. Please fill out the information below and keep with your receipt to assist in unit identification for future purchase issues. SAVE THESE INSTRUCTIONS - This manual contains important instructions that should be followed during installation and maintenance of the generator and batteries. [. . . ] NOTICE DO NOT place weatherproof enclosure under a deck or other type of covered structure that may confine airflow. 5 m) from windows, doors, any wall opening, shrubs or vegetation over 12 inches (30. Exhaust outlet side of weatherproof enclosure must have at least 5 ft (1. 5 m) minimum clearance from any structure, shrubs, trees or any kind of vegetation. NOTICE DO NOT place weatherproof enclosure under a deck or other type of covered structure that may confine airflow. Install the standby generator in a location where sump pump discharge, rain gutter down spouts, roof run-off, landscape irrigation, or water sprinklers will not flood the unit or spray the enclosure and enter any air inlet or outlet openings. Install the standby generator where it will not affect or obstruct any services (including covered, concealed and underground), such as telephone, electric, fuel (natural gas / LPG vapor), irrigation, air conditioning, cable, septic, sewer, well and so forth. Install the standby generator where leaves, grass, snow, etc will not obstruct air inlet and outlet openings. If prevailing winds will cause blowing or drifting, you may need to construct a windbreak to protect the unit. Engines, and their weatherproof housings if provided, that are installed outdoors shall be located at least 1. A minimum separation shall not be required where either of the following conditions exist: 1. TO THE INSTALLER: Consult with the generator owner(s) and convey any technical considerations that might affect their installation plans before applying these general guidelines. The following general rules apply to gaseous fuel system piping: WARNING Propane and Natural Gas are extremely flammable and explosive, which could cause burns, fire or explosion resulting in death, serious injury and/or property damage. Before placing the generator into service, the fuel system lines must be properly purged and leak tested. A union C or flanged connection shall be provided downstream to permit removal of controls. When the initial test runs are completed, the manometer is removed and the port is plugged. The manometer port permits temporary installation of a manometer to ensure that the engine receives the correct fuel pressure to operate efficiently throughout its operating range. NOTICE The supplied flexible steel fuel line is not to be installed underground or in contact with the ground. The entire flexible steel fuel line must be visible for periodic inspection and must not be concealed within nor contact nor run through any wall, floor, or partition. The piping should be of a material that conforms to federal and local codes, rigidly mounted and protected against vibration. Piping should be protected from physical damage where it passes through flower beds, shrub beds, and other cultivated areas where damage could occur. Where the formation of hydrates or ice is known to occur, piping should be protected against freezing. [. . . ] After the engine has stopped: · If an adjustment was made in step 11, repeat steps 2 through 7. If no load frequency falls out of the no load range shown in step 7 after full load adjustment is made, contact an authorized service center. Using needle nose pliers, bend spring anchor tang B slowly up or down until frequency is 62. Should that voltage drop below a preset level, control board action will signal the engine to crank and start. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE GENERAL ELECTRIC AGQ05




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual GENERAL ELECTRIC AGQ05 will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.