Detailed instructions for use are in the User's Guide.
[. . . ] The thickness of the pipe must be 0. 8 mm at least.
HSU-07HV03/R2(DB) HSU-09HV03/R2(DB) HSU-12HVB03/R2(DB) HSU-14HV03(DB) HSU-09HVA103/R2(DB) HSU-12HVA103/R2(DB) HSU-12HV03/R2(DB) HSU-18HV03/R2(DB) HSU-22HV03/R2(DB) HSU-18HVA103/R2(DB) HSU-22HVA103/R2(DB)
Liquid pipe( Gas pipe( )
)
6. 35mm(1/4") 9. 52mm(3/8")
6. 35mm(1/4") 12. 7mm(1/2")
2
Indoor unit
1. Fitting of the Mounting Plate and Positioning of the wall Hole When the mounting plate is first fixed
1. Carry out, based on the neighboring pillars or lintels, a proper leveling for the plate to be fixed against the wall, then temporarily fasten the plate with one steel nail. Make sure once more the proper level of the plate, by hanging a thread with a weight from the central top of the plate, then fasten securely the plate with the attachment steel nail. Find the wall hole location A using a measuring tape
A=80mm
Fit the level line
When the mounting plate is fixed side bar and lintel
Fix to side bar and lintel a mounting bar, Which is separately sold, and then fasten the plate to the fixed mounting bar. When the mounting plate is first fixed ", for the
2. Making a Hole on the Wall and Fitting the Piping Hole Cover
Make a hole of 70 mm in diameter, slightly descending to outside the wall. [. . . ] Install piping hole cover and seal it off with putty after installation Indoor side Wall hole 70mm Outdoor side Thickness of wall
(Section of wall hole) G Piping hole pipe
3. Installation of the Indoor Unit Drawing of pipe
[ Rear piping ]
Draw pipes and the drain hose, then fasten them with the adhesive tape
[ Left
Left-rear piping ]
In case of left side piping, cut away, with a nipper, the lid for left piping. In case of left-rear piping, bend the pipes according to the piping direction to the mark of hole for left-rear piping which is marked on heat insulation materials.
3
35
Indoor unit
1. Insert the drain hose into the dent of heat insulation materials of indoor unit. Insert the indoor/outdoor electric cable from backside of indoor unit, and pull it out on the front side, then connect them. Cover the connection part with heat insulation materials closely, and make sure fixing with adhesive tape
Heat insulation material Lid for right piping Lid for under piping Lid for left piping Drain hose
Piping
Pipe supporting plate
Indoor/outdoor electric cable
Fix with adhesive tape
Indoor/outdoor electric cable and drain hose must be bound with refrigerant piping by protecting tape.
[Other direction piping]
Cut away, with a nipper, the lid for piping according to the piping direction and then bend the pipe according to the position of wall hole. Connect beforehand the indoor/outdoor electric cable, and then pull out the connected to the heat insulation of connecting part specially.
Fixing the indoor unit body
Hang surely the unit body onto the upper notches of the mounting plate. In order to fix the body onto the mounting plate, hold up the body aslant from the underside and then put it down perpendicularly.
4. Connecting the indoor/outdoor Electric Cable Removing the wiring cover
Remove terminal cover at right bottom corner of indoor unit, then take off wiring cover by removing its screws.
When connecting the cable after installing the indoor unit
1. Insert from outside the room cable into left side of the wall hole, in which the pipe has already existed. Pull out the cable on the front side, and connect the cable making a loop.
4
Indoor unit
When connecting the cable before installing the indoor unit
Insert the cable from the back side of the unit, then pull it out on the front side. Then connect the projection of charge hose (center) for gaugemanifold into vacuum pump. If the scale-moves of gause (Iow) reach vacuum condition in a moment, check 1 again. Tube(for R410A) Vacuum pump(for R410A) Gaugemanifold(for R410A) Anti countercurrent joint 2-way valve Liquid Side 3-way valve Gas Side
Open
3 Vacuumize for over 15min. And check the level gauge which should read -0. 1 MPa (-76 cm Hg) at Iow pressure side. After the completion of vacuumizing, close the handle 'Lo' in gaugemanifold and stop the operation of the vacuum pump. If the scale-moves back in spite of tightening, make flaring work again, the return to the beginning of 3 . 4 Open the valve rod for the 2-way valve to an angle of anticlockwise 90 degrees. After 6 seconds, close the 2-way valve and make the inspection of gas leakage.
Open
Close
2-way valve 2-way valve 3-way valve 3-way valve
90
O
5 No gas leakage?
In case of gas leakage, tighten parts of pipe connection. 6
If it does not stop gas leakage, discharge whole refrigerants from the service port. [. . . ] After 6 seconds, close the 2-way valve and make the inspection of gas leakage.
Open
Close
2-way valve 2-way valve 3-way valve 3-way valve
90
O
5 No gas leakage?
In case of gas leakage, tighten parts of pipe connection. 6
If it does not stop gas leakage, discharge whole refrigerants from the service port. After flaring work again and vacuumize, fill up prescribed refrigerant from the gas cylinder. 2-way valve
HSU-22HV03/R2(DB) HSU-22HVA103/R2(DB)
2-way valve
3-way valve
6 Detach the charge hose from the service port, open 2-way valve and 3-way. [. . . ]