User manual HAWKE 755 ASSEMBLY AI319 ISSUE L 11-08

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual HAWKE 755. We hope that this HAWKE 755 user guide will be useful to you.


HAWKE 755 ASSEMBLY AI319 ISSUE L 11-08: Download the complete user guide (380 Ko)

You may also download the following manuals related to this product:

   HAWKE 755 DATASHEET (150 ko)

Manual abstract: user guide HAWKE 755ASSEMBLY AI319 ISSUE L 11-08

Detailed instructions for use are in the User's Guide.

[. . . ] 'I' = 13/16" (20mm) for cable gland sizes Os to A 'I' = 1" (25mm) for cable gland sizes B to C2 'I' = 1 1/4" (32mm) for cable gland sizes D to H 'II' to suit equipment. Spread armour over the spigot until the end of the armour is up against the shoulder of the spigot. Position the clamping ring . C Remove the brass pot from the entry . Place the entry over the armour spigot Move the sub-assembly and up to meet the entry . [. . . ] Tape the conductors together to prevent disturbance of the compound seal. Pass the brass pot over the armour spigot and remove any surplus compound from the top of brass pot and the joint face as indicated. H Replace the entry over the brass pot ensuring that compound does not cover the end of the brass pot . I Locate and hand tighten the sub-assembly and onto the entry . Unscrew the sub-assembly and from the entry then remove any surplus compound from the gland components. Again locate and hand tighten the sub-assembly and onto the entry . IMPORTANT: The conductors must not be moved for a minimum of four hours. AI 319 - Issue L / Page 2 of 4 6 5 6 2 2 1 1 J Allow the compound to cure. Check that the compound has cured. K Hand tighten the sub-assembly and onto the entry and add half to three quarters of a turn with a spanner/wrench. Tighten the backnut to form a seal around the cable, then tighten a further full turn using a wrench/spanner. Ensure that the middle nut does not rotate when tightening the backnut. Locate the shroud over the cable gland, if applicable. The following instructions are the approved methods of passing drain wires etc. through the compound barrier and should be followed if permitted by cable installation specifications. UNINSULATED EARTH OR DRAIN WIRE PREPARATION 1. 0 INSULATING EARTH OR DRAIN WIRES WITH HEAT SHRINK OR COLD SHRINK TUBING 1. 1 Fold back the armour and bend it to right angles from the inner sheath. 1. 2 Remove foils and tape level with the outer sheath, exposing the uninsulated earth or drain wires and insulated conductors. 1. 3 Pass 100mm length of heat shrink or cold shrink tubing over the uninsulated earth or drain wire until it comes into contact with the foils, then shrink the tubing evenly down onto the uninsulated earth or drain wire so that no air pockets occur. 1. 4 To insulate the joint between the foils and the tubing a suitable piece of 10mm long shrink tubing or neoprene stretch tubing or a 10mm wide lap of PVC tape may be used. 1. 5 After completing 1. 1 to 1. 4 on each earth or drain wire, lay the armour parallel to the cable, if applicable, then carry out instruction B. INDIVIDUAL SHIELDING OR SCREEN PREPARATION 2. 0 INSULATING SCREENS WITH HEAT SHRINK OR COLD SHRINK TUBING 2. 1 Fold back the armour and bend to right angles from the inner sheath. 2. 3 Unravel one or two groups of wires from the individual shielding or screen wires, then remove the remainder of the individual shielding or screen wires (See Fig. 2. 4 Pass 100mm length of heat shrink or cold shrink tubing over the individual shielding or screen until it comes into contact with the foils, then shrink the tubing evenly down onto the individual shielding or screen so that no air pockets occur. 2. 5 To insulate the joint between the individual shielding or screen wires and the tubing, place one lap of PVC insulating tape over the exposed metallic joint. 2. 6 After completing 2. 1 to 2. 5 on each individual shielding or screen, lay the armour parallel to the cable. Then carry out instruction B. Armour Inner Sheath Shielding Screen Wires One or two groups of shielding screen wires Fig. [. . . ] This must be fitted to the wall of the enclosure using the threads of the gland and the locknut supplied. Note: Grounding must be carried out in accordance with National Electrical Code Article 250 and 505. 25. A correctly sized grounding conductor must be connected from the tag to the nearest internal connection point of the grounding circuit. When the gland is used with enclosures having plain (strikethrough/drilled) entry holes, a UL listed (QRCV) sealing washer must be employed and the gland must be secured to the enclosure using the locknut provided. AI 319 - Issue L / Page 4 of 4 ACCESSORIES: Before cable gland assembly or stripping of the cable gland assembly, consideration should be given to any cable gland accessories that may be required, such as: Shroud, to offer additional corrosion protection. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE HAWKE 755




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual HAWKE 755 will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.